⎝⎛韦德足球⎞⎠


020-82510321



Or leave us a message

Leave message

News Detail

Your current location : ⎝⎛韦德足球⎞⎠ > About Morato > Company News > Company News > News Details

Tianhe District Emergency Command Center Phase I Construction Project Successfully Accepted

作者:广州市莫拉图通信设备有限公司 来源:广州市莫拉图通信设备有限公司 浏览次数:3154 Published: 2017-10-26 Author: Guangzhou Communication Equipment Co., Mora Figure Source: Figure Mora Guangzhou Communication Equipment Co. Views: 3154

I. Project Introduction

(I) Project Name: Tianhe District Emergency Command Center Phase I Construction Project

(II) Construction unit: Office of the People's Government of Tianhe District, Guangzhou

Equipment requirements

The main equipment of the project (including large-screen display system equipment, information interactive processing system platform, video image access system equipment, non- chemical service platform, programmable central control host, digital conference system host, integrated command and dispatch system equipment, digital cluster communication System equipment, video emergency command system equipment and integrated information visualization system equipment, etc.).

Project Overview

(I) Project background

区相关单位及21个街道办事处,实现三级视频互联互通,集视频监控、视频会议、指挥调度于一体化的区级应急指挥中心。 The Tianhe District People's Government Office of Guangzhou plans to build a vertically-connected city-level emergency command center that horizontally connects district government departments, such as the district public security bureau, environmental protection bureau, residential construction water service (transport) bureau, urban management bureau, safety supervision bureau, and food Relevant units in the district including the Drug Administration, the Tianhe Fire Brigade, and 21 sub-district offices have realized three-level video interconnection and interoperability, integrating video surveillance, video conferencing, and command dispatch in an integrated district-level emergency command center. 型内容的建设。 This phase of the project involves the construction of three types of content : basic support system, command site construction, and emergency comprehensive information display system .

(Two) construction goals

With reference to the relevant technical requirements of the State Council's Emergency Management Office's "National Emergency Platform System Technical Requirements (Trial)", relying on the region's informatization construction foundation, improve the emergency management mechanism, improve the management of various emergency plans, and use the most advanced Network technology, computer application technology, aiming at "comprehensive functions, resource integration, service leadership, and convenient command", while satisfying the daily emergency law enforcement and management needs of the district, it is constructed as a "capable of peacetime management, command of wartime, post-war An intelligent emergency command center that can analyze, and can be commanded everywhere and mobilized from time to time.

The first phase of the construction goal is to deploy the basic hardware environment of the emergency command hall in the region and build a video emergency interconnection platform in the region to provide a hardware support foundation for the subsequent expansion and construction of emergency informatization and ensure the construction of a platform that can provide Analyze and make decisions, usually used in district government conferences, video conferences, and other emergency command halls that are integrated with multiple functions to ensure a high utilization rate of the information system in the command hall, thereby preventing waste of information resources and ensuring that the overall construction effect is achieved within the city. Advanced level.

(Three) construction content

Emergency Command Site: The emergency command site will be transformed from 3 offices on the first floor of Building No. 2 of the Tianhe District Government Office, including 3 functional areas including the computer room (equipment room), the command decision room (command center), and the agent dispatch area . The original office has the same length, width, and height, in that order: 7.2 meters long, 6.6 meters wide, and 3.8 meters high, with a total area of about 150 square meters. The district emergency command center needs to build new integrated wiring, access control, equipment rooms, and conference equipment. The conference equipment includes 2x4 80-inch DLP splicing large screens, visual interactive systems, digital conference systems, video tracking systems, sound reinforcement equipment, signal processors, Central control system, paperless conference system, etc.

Basic support system: Utilize the communications resources of Tianhe District's public communications and professional departments to build and improve emergency voice communication networks and computer networks to meet the functional requirements of image transmission and wired communication command and dispatch. It mainly includes a variety of hardware systems such as emergency voice communication command and dispatch system, computer network system, host and storage system, image access system, video emergency command system, panoramic emergency command system and integrated information visualization system. It also purchased handheld mobile terminals and leased wireless dedicated line networks to realize mobile office for emergency services.

Mobile emergency system: It is equipped with a mobile emergency system, including a digital trunked communication system and two sets of individual mobile emergency platforms and related emergency portable computers, supporting 4G transmission modules, communication equipment, etc., to facilitate the command center to obtain live audio and video information and Command and dispatch the on-site emergency response personnel for application needs.

Comprehensive information display system: Complete the emergency comprehensive information display system in Tianhe District to display a variety of business information and resources, including the display of information on various processing links of emergencies and the summary and comprehensive display of daily business information.

Ensure that the following functions are supported in subsequent system function extensions:

1. Realize the video-based dispatch center, and dock all video resources with the District Public Security Branch;

目标; 2. Satisfy the docking needs of the Xueliang project, and achieve the overall goal of "wide coverage, full network sharing, full time availability, and full controllability" of video construction ;

3. Realize the system's two-way interaction, command dispatch, and docking with the grid command system to achieve real-time response to map screenshots and order adjustments;

4. Realize joint emergency command with the integrated command centers of all streets in Tianhe District, build a cloud governance platform for social governance in Tianhe District, and realize the expansion of "four managements in one " (policy management, social management, urban management, and government affairs management).

Our colleagues in the project department of Guangzhou Morato Communication Equipment Co., Ltd. are responsible and responsible for successfully completing the first phase of the construction project of the Tianhe District Emergency Command Center, and accepted by the district government. The actual use effect fully meets the project construction's vision and eyeballs. Get full affirmation. Our company will continue to work hard for the emergency communication of the private network in a state of high effort, high professionalism and high responsibility, and make continuous efforts to build a smart city and smart management for the government.

share to:
label:
七乐彩 欢乐拼三张 欢乐拼三张 真人游戏平台注册